Derived from 9 documents across
9 kinds,
8 approved.
Regenerated 2026-08-03 11:40 UTC — not hand-edited.
VERDICT
Coverage is complete, every approved document passes audit, and no open risk or overdue review stands against this project. Green is earned, not assumed.
HEALTH
GREEN
2 open risk(s)
DOCS APPROVED
8/9
9 of 9 pass audit
COVERAGE
100%
23 of 23 links traced
OPEN RISKS
2
2 dispositioned
NEXT MILESTONE
12d
Risk disposition released · 2026-08-15
DOC SET
4/4
0 of 1 recommended open
01Completion & coverage23 / 23 traceability links
business requirement covered by a product requirement5/5
product requirement covered by an acceptance criterion7/7
acceptance criterion covered by a test case11/11
traced gap
DOCUMENT SET · LEAN-STARTUP
✓charter REQUIREDcomplete
✓brd REQUIREDcomplete
✓prd REQUIREDcomplete
✓test-cases REQUIREDcomplete
✓risk-register RECOMMENDEDcomplete
4 of 4 required complete · 0 of 1 recommended still open
02Roadmapnext: Risk disposition released in 12d
Bridge per-project mapping released
2026-07-31
ELAPSED
Risk disposition released
2026-08-15
IN 12 DAYS
Operations kind and profile released
2026-09-15
IN 43 DAYS
1.0 release with stability policy
2026-10-31
IN 89 DAYS
SEQ 1SEQ 2
An operations document kind and profile shall exist,
ENG-PR-003 · 3 st · 1 ac
M 4pt · done
Bridge commands shall accept a project filter and a
ENG-PR-001 · 2 st · 1 ac
M 3pt · done
Risk items shall carry a disposition (open, mitigate
ENG-PR-002 · 2 st · 1 ac
M 3pt · done
Bridge mutations shall be safe under concurrent runs
ENG-PR-006 · 2 st · 1 ac
M 3pt · done
The public CLI surface shall be documented, and a st
ENG-PR-004 · 1 st · 1 ac
S 2pt · done
Continuous integration shall enforce a coverage floo
ENG-PR-005 · 1 st · 1 ac
S 2pt · done
Status pages shall present the derived model as a de
ENG-PR-007 · 7 st · 5 ac · after ENG-PR-001
XL 12pt · done
position = dependency sequence (`after` layers)width = scope points = stories + acceptance criteria (no estimation, no time axis)XS=1 · S=2 · M=3–4 · L=5–7 · XL=8+doneopenblockedscoped
03Risk register2 open · 0 high-impact
HEAT MATRIX · PROBABILITY × IMPACT
PROBABILITY → Click a cell to isolate the risk below.
IDRISKPROBIMPACT
04Documents9 total · 9 pass audit
KINDIDSTATUSAUDIT
05Work18/18 stories closed
TYPEITEMASSIGNEESTATE
scope · every open issue matches an approved item in the documents
06Recent activitydocuments/ commit history
2026-07-05Pages deploy: per-attempt artifact name so follower reruns can heal (#102)