all projects
docassert status · live from repo
GREEN PRJ-003-STD

Standard 1.0

Derived from 7 documents across 7 kinds, 6 approved. Regenerated 2026-08-03 11:40 UTC — not hand-edited.
VERDICT

Coverage is complete, every approved document passes audit, and no open risk or overdue review stands against this project. Green is earned, not assumed.

HEALTH
GREEN
1 high-impact risk(s) open
DOCS APPROVED
6/7
7 of 7 pass audit
COVERAGE
100%
16 of 16 links traced
OPEN RISKS
2
1 dispositioned
NEXT MILESTONE
28d
Risk metadata and disposition semantics specified · 2026-08-31
DOC SET
4/4
0 of 1 recommended open
01Completion & coverage16 / 16 traceability links
business requirement covered by a product requirement4/4
product requirement covered by an acceptance criterion6/6
acceptance criterion covered by a test case6/6
traced gap
DOCUMENT SET · LEAN-STARTUP
charter REQUIREDcomplete
brd REQUIREDcomplete
prd REQUIREDcomplete
test-cases REQUIREDcomplete
risk-register RECOMMENDEDcomplete
4 of 4 required complete · 0 of 1 recommended still open
02Roadmapnext: Risk metadata and disposition semantics specified in 28d
Risk metadata and disposition semantics specified
2026-08-31
IN 28 DAYS
Execution mapping promoted from informative appendix to normative section
2026-09-30
IN 58 DAYS
Operations kind specified
2026-10-15
IN 73 DAYS
1.0 published with versioning policy
2026-11-30
IN 119 DAYS
SEQ 1
Risk item metadata (probability, impact, owner, resp
STD-PR-001 · 1 st · 1 ac
S 2pt · open
The execution mapping shall be promoted from informa
STD-PR-002 · 1 st · 1 ac
S 2pt · open
The operations document kind shall be specified, inc
STD-PR-003 · 1 st · 1 ac
S 2pt · open
The conformance suite shall reach 80 cases or more,
STD-PR-004 · 1 st · 1 ac
S 2pt · open
The specification shall carry a versioning policy se
STD-PR-005 · 1 st · 1 ac
S 2pt · open
Specification completeness shall be enforced in both
STD-PR-006 · 1 st · 1 ac
S 2pt · open
position = dependency sequence (`after` layers)width = scope points = stories + acceptance criteria (no estimation, no time axis)XS=1 · S=2 · M=3–4 · L=5–7 · XL=8+doneopenblockedscoped
03Risk register2 open · 1 high-impact
HEAT MATRIX · PROBABILITY × IMPACT
PROBABILITY →
Click a cell to isolate the risk below.
IDRISKPROBIMPACT
04Documents7 total · 7 pass audit
KINDIDSTATUSAUDIT
scope · every open issue matches an approved item in the documents
06Recent activitydocuments/ commit history
2026-07-05Pages deploy: per-attempt artifact name so follower reruns can heal (#102)